Comparative Timber Frame Build Costs
This section looks at a whole range of construction elements and compares the costs involved with executing these using a timber frame method as against 'conventional' construction.
← ← ← ← on the menu to the left you will fnd the following:-
Preliminaries:-• Cost of Preliminaries • Pre-site setup costs • Physical site provision costs • Hire costs |
Possible Timber Fame Savings• Potential foundation savings • Lightweight structure savings • Savings in ‘bad’ ground • Tree problem savings |
Timber Frame Cost Influencers• Factory manufacture savings • Building programme savings • Architects say T-F costs less • Other programme savings • Building Regs 2010 costs • Flexibility to meet criteria • Key B. Reg changes |
If you have a particular question or problem we’ll be happy to answer it for you.
Just e-mail our Build Centre using our contact form