Budget Estimate DIY-B |
|
|
|
|
|
|
|
Thank you for your enquiry for an unpainted / undecorated Timber Balcony "Kit" delivered to the above property. From the information provided by you, subject to any design and engineering necessary, we estimate the price as
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Glulam |
|
|
|
Douglas Fir |
|
|
Green Oak |
|
|
|
Supply |
Erection
|
|
|
Supply |
Erection |
|
|
Supply |
Erection |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prices include design, standard engineering, delivery & VAT |
|
|
|
Minimum Erection Cost Inc VAT = £900 |
|
|
|
|
|
|
|
|
Possible Extras |
|
|
|
|
Supply |
Fix |
|
|
|
|
|
Ply & EPDM waterproofing under deck |
|
|
|
|
|
|
|
Gutter & Downspout |
|
|
|
|
|
|
|
Open tread softwood straight stairs & handrails |
|
|
|
|
|
|
|
|
|
|
|
|
When you are ready to order, confirm this price by e-mailing a PDF of your (sketch) plan with exact wall opening positions |
|
|
|
|
|
|
|
|
|
|
Specification |
|
|
Your choce of timber for - Posts 150mm x 150mm, Beams 100mm x 220mm, corner braces 75mm x 150mm |
|
C16 Softwood for - Joists 50mm x 150mm, Baluster posts and handrails ex 100mm x 100mm, Infil ex 25mm x 100mm
|
|
Joists set at maximum 600mm centres, with shaped end if required, will be laid to a side to side fall of circa 2cm per 4m |
|
Decking 300mm x 22mm composite anti-slip grooved sheets with 5mm gaps, end caps & fixings.
|
|
Timber is planed, untreated, ready for you to treat or decorate to your preference. |
|
Post shoes and other metalwork are galvanised steel |
|
Note: Number of Posts & Beams adjusted to suit our system |
|
|
|
Design & Engineering |
|
To minimise interference with existing buildings, we design balconies as independent structures with posts front and back
|
|
Our standardised designs allow for a balcony platform height of up to 2.7m, with posts at min 2m and max 3m centres |
|
Engineering calculations assumed as being industry standard. If special engineering and calculations required, e.g. for
|
|
Building Control, these are priced extra at current rates. |
|
|
Door & Window Openings |
|
We generally try to avoid posts and beams crossing window and door openings, and may have short cantiliver ends
|
|
Manufacturing drawings are produced in accordance with your drawings and measurements and sent for your approval |
|
One set of changes allowed without extra charge.
|
|
|
Manufacture, Delivery and Storage |
|
After you have approved drawings, components will be manufactrured to suit drawings and a schedule of all components |
|
produced to accompany delivery. This will be to the nearest hard surface for you to unload and store on bearers off the
|
|
ground on a level hardstanding. You should provide sheeting or other protection against weather for these materials |
|
Up to 2 hours FOC allowed for unloading |
|
|
Foundations |
|
You are responsible for providing a solid foundation for the post bases, either by excavating and concreting, or by providing |
|
plinths for these to be fixed to. The galvanised post shoes need to be bolted to these bases, either with rag bolts cast into
|
|
the concrete, or by chem-fix anchor bolts drilled and set into these. |
|
|
Erection and Site Fixing |
|
Rear most posts are set off the wall/s by approximately 50mm and bolted back to the wall/s often with a spacer in
|
|
between post and wall. The same aplies to the rear ballustrade posts. |
|
Joists are cross fixed onto the beams running lengthways side to side, which have solid blocking pieces between them |
|
over the beams. The decking is fixed directly to the joists with gaps in between. |
|
Illustrated erection instructions provided with kit. |
|
Waterproof Deck |
|
If an impervious surface is required, then a ply underdeck, with EPDM (synthetic rubber) overlay can be fixed over the
|
|
joists and under the decking at extra cost In this case a gutter and downspout extra may be needed at the end/s to |
|
receive and discharge rain / snow run-off. |
|
|
Lead time |
|
We usually need 2 to 3 weeks from receipt of your order to send drawings for your approval, but this may be sooner.
|
|
Manufacturing will start some 2 weeks after you have approved drawings with the kit delivered a week or so later. If
|
|
erection is ordered at the same time as the 'kit', this can usually be arranged to start within a week or so of delivery
|
|
|
Terms & Conditions |
|
Our normal terms and conditions of sale for timber frame structures applies.
|
|
|
Payment |
|
Payment 30% with order, 70% before manufacturing starts.
|
|
We accept major debit & credit cards, CHAP's, BACS, or cleared cheques (allow 7 days for clearance) |
|
E&OE |
|
We trust that this meets with your approval and look forward to receiving you order in the near future. |
|
|