Your weekly insight of things you may have missed

Share on Facebook ?   Tweet this Email ?   Share on Google +
 
Email not displaying correctly? View it in your browser.
Facebook Twitter Google

Why are Britain's new homes built so badly?

- The Guardian

  Disillusioned Buyers

In March 2017, an article by Julie Kollewe in The Guardian compared UK construction standards to those abroad - and talked to buyers deeply disillusioned by their experiences. More than half of buyers of newly built homes in England were reported to have had major problems. With various reports since then indicating that the situation may not have improved much, if at all, it seems appropriate to revisit this article at the start of the New Year.

  Dream Home...or Nightmare

Weak mortar, faulty drainage, unfinished fittings … for many buyers of newly built properties in Britain, their dream home quickly turns into a nightmare. It emerged that residents had to move out of a recently completed Manchester apartment block, Islington Wharf Mews, because it breaks fire safety rules.

  Not Unusual

But their tale of woe is far from unusual. More than half of buyers of new-build homes in England have had major problems with construction, unfinished fittings and faults with utilities, according to housing charity Shelter. The government even  branded the housing market "broken" in its housing white paper.
Photograph: Alamy

  Bovis' £7m for Repairs

Bovis Homes, one of Britain's biggest housebuilders, recently had to set aside £7m to repair poorly built new homes sold to customers, and its interim boss publicly apologised to customers.

  Customer Satisfaction Ratings

The Home Builders Federation and the National House Building Council (NHBC) carry out an annual customer satisfaction survey in which most companies score four or five stars. However, at that time Bovis had slipped to three stars from a top rating five years earlier, while Persimmon, which owns the upmarket Charles Church brand, had also seen its rating dip to three stars. The latest scores are likely to be published by early April.

  HBF Defence

The federation says the reported problems with new-builds are isolated incidents. Its spokesman, Steve Turner, says: "When you are building tens of thousands of any product, let alone something as complex as a house, outside, in all weathers, there are inevitably going to be a small number of cases where there are issues. The industry works hard to ensure it addresses such issues when they arise. Overwhelmingly, the buyers of new homes are happy with their purchases."

  Not Built to Last!

The Shelter research suggests otherwise; and some homeowners have told their unpleasant experiences to the Guardian. One buyer, who is in a long-running dispute with one of the big housebuilders over structural issues at his house, says: "A lot of these houses are going to fall apart 30 years down the line. They are not built to last."

  Germany Rescinds Licences

Mark Farmer, a former partner at international consultancy EC Harris, who now runs his own construction consultancy, said: "In Germany, if there are evidenced problems with build quality the regulatory authorities can rescind the licence. This is a 'barrier to entry' related to craft skills and basic competence levels that we just do not have in the UK."

  What & Who's to Blame?

Experts say the rush to build homes amid Britain's chronic housing shortage, and the dominance of a few big building firms that use a multitude of subcontractors, are also to blame for poor building standards.

  Distressed Buyers

Paula Higgins, who runs the campaign group HomeOwners Alliance, said: "The quality of new-build homes is becoming more and more of an issue and we are hearing from more and more distressed buyers every week." She suggested safeguarding homeowners' rights as they do in the Netherlands or France (see below).

  Country Comparisons

So how does the construction process in the UK compare with other countries? We found that in Germany and the Netherlands regulations and standards are much stiffer - but in New Zealand, cases of poor quality building appear to be as common as in Britain.
Photograph: Graham Turner for the Guardian

  Length & Type of Apprenticeships

In Britain, the average construction apprenticeship lasts 20 months. It takes less than two years to train as a plasterer, bricklayer or other tradesperson in the UK and obtain NVQ qualifications, the industry standard in England and Wales. The average construction apprenticeship lasts 20 months. However, from September UK universities and colleges will offer degree-level apprenticeships in construction lasting three to four years.

  Unlicensed Builders

Builders are under no legal obligation to obtain a licence to practise. They can voluntarily sign up to a body such as the NHBC or the Federation of Master Builders, but there is no single licensing body.

  Building Controls

All homes need to be signed off by the local authority building control to ensure that each key stage meets building regulation standards. Organisations such as NHBC can provide approved inspectors to do these checks. NHBC says in about half of the homes where it provides warranty, building control is carried out by another body, usually the local authority.

  NHBC Questioned

Questions have been raised over NHBC's independence after it emerged that the organisation pays millions of pounds to housebuilders every year. It says it only paid £4.5m last year, compared with £90m paid for homeowner claims. Similar to a no-claims discount, the premium refund scheme recognises builders with a long-term good claims history. It stresses: "NHBC is a private non-profit distributing company with no shareholders and we are independent of government and builders."

  Rectification

Within the first two years of a home purchase the housebuilder is responsible for rectifying defects; thereafter a 10-year warranty issued by NHBC or another firm kicks in. "So if something major goes wrong after the build is complete, the warranty provider would have to pay for this to be rectified. So it is in their best interests to thoroughly inspect the stages of the work," says Anna-Marie DeSouza of the National Custom & Self Build Association.

  Germany

The German construction market is much more regulated than the UK, with strict government rules on construction and energy efficiency. There is currently a debate about whether to relax some of these rules to speed up construction of badly needed homes, says Michael Voigtländer, a professor at the Cologne Institute of Economic Research.
  • Local Builders
    Germany does not have big national housebuilders like the UK, only local and regional developers. About 15%-20% of family homes are pre-manufactured in factories (like HUF houses), which means less chance of things going wrong on site.
  • German Master Craftsmen
    Training of builders takes three years. Farmer says: "The 'master craftsman' status in Germany is a formal licence to trade, which is not the case here in the UK - it's similar to being able to call yourself a chartered surveyor or chartered architect in the UK. Hence the proliferation in the UK of 'builders' who do not have formal qualifications."

  Netherlands

In 1975 surveys of new-build properties were introduced, which have improved quality, with the average number of defects dropping over the years. In 2003, Vereniging Eigen Huis, the equivalent of the UK's HomeOwners Alliance, successfully lobbied the government for a law where the purchaser can withhold 5% of the price of a newly built house for six months to cover any snagging issues, and the final amount is determined through an independent inspection.

  France

Where a defect arises, the homeowner is not obliged to prove the fault and the builder is presumed to be responsible. Homeowners can bring legal action against the developer for up to 30 years if the property does not meet the specification in the sale contract. This compares with six years in England and Wales.

  New Zealand

Self-regulation of builders and ineffective warranties have resulted in big problems with leaky homes. The government has set up a fund to help with the cost of repair. There is currently no insurance-backed warranty - this is provided through the trade association for builders.
Katherine Harrison

  Dissatisfaction

Katherine Harrison lives in an apartment block adjacent to the Islington Wharf Mews development in Manchester, where residents have been forced to move out. She says her block, built in 2008, suffers from internal temperatures of more than 40C in summer, and leaky windows, with some bedrooms having windows that don't open.

  Temporary Measures

The developer, Waterside Places, provided temporary air conditioning units two years ago, but Harrison says they were "bulky, inconvenient and barely effective against the extreme temperatures".

  Developer's Apologies

Nigel Franklin, director of Waterside Places, apologised to residents and said the company was working with its contractor to rectify all the issues. "Identifying an effective solution for a building of this nature is a highly complex and lengthy process, so we can absolutely understand residents' frustration."

  ... But Continues

But to the dismay of residents, the firm, which is co-owned by the Canal & River Trust charity, is pushing on with phase three of the development, having received planning permission and a £10m loan from Manchester city council to build another block next door.

  No Remedial Work Done

Harrison said: "Although the company is ostensibly attempting to resolve the problems at Islington Wharf, the residents have been treated heavy handedly. We continue to struggle to get any commitment to a lasting, mutually acceptable solution. No remedial work has yet taken place and residents are living with extreme temperatures and water leaks."
Rob Godfrey.
"I was stupid to buy another new-build"

  Stupidity

Rob Godfrey says he and his partner bought a Bovis home more than three years ago "and had a lot of trouble, as many people do". The couple sold it and a year later bought "the Oxford", a four-bedroom house from Redrow, for £395,000 in Sittingbourne in Kent. He says he was reassured by the saleswoman that the company was a five-star builder (now four stars) and that three managers had to check and sign off before the property was handed over.

  Over 100 'Snags'

When Godfrey moved in the house had not been cleaned and the fuse box was left dangerously exposed, while the live earth wire was hanging down from the sink, he says. He has found more than 100 other "snags" and reckons he would have to take three weeks off to supervise the builder fixing them - on a nine-week-old home. "I was stupid to buy another new-build."

  Redrow's Admission

Redrow admitted it "fell below our usual high standards in some areas" but said it had taken action to resolve the "small number of items". It also said the overall customer satisfaction score for this development was 90%.
Catrina Heaton.
"You have more protection buying a £20 kettle"

  Self-Builds

Building your own home, popular in other European countries such as Germany, is less common here because of the high cost of land and the complex process to get planning permission. Beyond that, serious problems can occur, as with other new-builds.

  Re-Build Necessary

Catrina Heaton and her husband Fergus contracted Indigo Development Limited to build a house in Wimbledon, south-west London, in 2013. They say they now face a huge bill to rebuild it (similar to the original build cost) because, they claim, it is riddled with major faults.

  BRE's Confirmation

An independent report by the Building Research Establishment found issues with the external walls, water egress into the house, absence of firestoppers and breaches of building regulations. It found "a clear demonstration of a lack of knowledge of many aspects of building construction" and "commonly a careless and slapdash attitude to workmanship". An adjudicator ordered Indigo to pay nearly £356,000, which was a little more than 20% of the monies claimed by the couple. That sum has not been paid.
How buying a Bovis home came with hundreds of snags

  Levels of Protection

Heaton says: "Why is it that in this country, as a resident and homeowner, you have more protection buying a £20 kettle than putting your life savings into purchasing a brand new home or building a new dream home?"

  Call for Registration

She said builders should have to register as in other countries. "I was told many times this never happens in Germany because builders are registered. If they build an unsafe structurally unsound home, they lose their licence."

  Defects Admitted

The developer admitted there were defects, but argued the cost of fixing them was £150,000. Morrisons solicitors, acting on behalf of the former directors of Indigo, which has gone into liquidation, stated in a letter to the Heatons: "The property did not need to be rebuilt due to defects caused by Indigo Development. It is our client's belief that the rebuild of your property is due to the fact that you do not like the design of the home you had built." The couple argue that the directors put a solvent company into liquidation to avoid being taken to court.

  Build Off-Site for Manufacture & Assembly

DfMA (Design for Manufacture & Assembly) will not necessarily prevent on-site defect. But the greater accuracy and quality that can result from manufacturing components in a dry, controlled factory environment gives builders a much better chance of achieving improved on-site build quality. While resistance to the change to DfMA has been the norm, the wish of most UK Builders to deliver excellent customer service and top notch homes is now driving an increasing number to choose Off-Site for their developments. Also, as 'OffSite Hub" note, architects and designers are moving toward DfMA, something we have been encouraging for over 20 years.  To assist them in doing so our "Easy Timber Frame" now offers standard size modular timber frame elements for them to use as a design base, cutting down on technical design and engineering to produce win-win results.

   Better all-round Savings

Our specialist services and CUSTOM homes division deliver best value and  protect the interests of land owners, house-builder developers, professionals and private individuals seeking to build their dream home. Our off-site construction systems also reduce the amount of material that gets wasted on site, helping to avoid land fill, hazardous waste separation and handling, They also deliver better value for you and your customers.
PLEASE CONTACT US FOR AN INFORMAL DISCUSSION AS TO HOW WE MIGHT WORK TOGETHER
 
Call us to arrange a factory visit and discuss your ideas and needs with our in-house team of professionals for your next project. You'll be glad you did!
 
 
• Timber Frame   • SIP Frame   • Post & Beam   • Traditional Feature Trusses   • Glulam Structures  
• Hybrids   • Low Energy Components
 
For really attractive, flexible, affordable and HEALTHY Low Energy Homes, call, send us your drawings, or visit our manufacturing plant now.
Some of our previous weekly insights:
 
 
 
We'll have more information for you next week. In the meantime, head to Build News for your daily insight into the construction industry.
 
 
 
 
"Technical Timber Frame Designers & Builders of UK's 1st Amphibious House"
You are receiving this email because you have previously requested information from us or enquired about our products or services. If you would prefer not to receive anything else from us, please use this unsubscribe link rather than reporting it as spam. We take spam-avoidance seriously and will honour all requests to be removed from our mailing list.
 
Benfield ATT Group
5 - 6 Castle Way
Severnbridge Industrial Estate
Caldicot
MON. NP26 5YG
 
T: (0)1291 437050
E: info@benfieldatt.uk
W: www.benfieldatt.uk